Dry Bulk Terminal

Location of the Dry Bulk Terminal:

  • The Dry Bulk Terminal is located north of Terminal 1, 65 km from Antofagasta and 1,400 km from Santiago.

Terminal Features:

  • As the second port built at CPM, it began operations in 2011.
  • It involved an investment of US$74 million.
  • It has a berthing site with capacity for 4,200 MM tons per year.
  • It has low-environmental-impact technology, such as tubular belt enclosed conveyors belts and dry-mist dust-suppression systems.

CPM Concession Companies:

  • The terminal was financed and built by the company, Terminal Graneles del Norte.
  • TGN will hold the terminal concession until 2026.